Earthquake performance objectives

Seismic-isolated RC core-wall structure

This will improve the earthquake safety of カジノシークレット 出金 確認ilding, including the square,
thereby contributing to カジノシークレット 出金 確認siness continuity plan(BCP)and the district continuity plan(DCP).
The frames above the isolation-story will have RC core walls in the center.These walls カジノシークレット 出金 確認 connected with outrigger beams and damping beams,
ensuring high performance in terms of seismic vibration.
The RC core walls will function as the mandrel of カジノシークレット 出金 確認ilding,
enabling a significant reduction of acceleration and drift over the range to the upper floors.

Core wall
Laminated rubber
Laminated rubber
Core wall
Core wall
Oil damper
Oil damper
Damping beam
Damping beam
Outrigger beam
Outrigger beam

Special Grade — the highest grade of seismic resistance performance

The highest grade of seismic resistance performance in Japan has been achieved.
This will enable business to continue even in the event of an earthquake directly beneath the Tokyo Metropolitan Area,
as is expected to occur in the future.

Special Grade

A seismic-isolated structure that is rare among super high-rise buildings

Drift caused by an earthquake is controlled to one-fourth compared to a common damping structure and to half compared to a seismic-isolated structure, thus protecting people inside カジノシークレット 出金 確認ilding.

Seismic-isolated structure

Significantly reducing the duration of shaking after the earthquake

Compared to a common damping structure, the seismic-isolated RC core-wall structure reduces the duration in which カジノシークレット 出金 確認ilding keeps shaking after an earthquake, thus minimizing the impact on business continuity.

Seismic-isolated RC core-wall structure

Comparison of shaking

BCP

Power supply

A reliable three-line spot network system with extra high voltage (22 kV) will be adopted for receiving power at normal times. This will reduce the risk of power outages and ensure stable power supply to カジノシークレット 出金 確認ilding. During the daytime on weekdays with high power consumption from air conditioners and other equipment, カジノシークレット 出金 確認ilding will also use a co-generation system (CGS), thus reducing energy consumption by approx. 20%. Even in the event of a power transmission issue or a power outage, power will continue to be supplied to common area and tenants’ exclusive areas with CGS, which generates power with disaster-resistant, medium-pressure gas, and an emergency power generator with a large-capacity oil tank (that will operate for approx. 72 hours). カジノシークレット 出金 確認ilding will also have space for installing tenants’ emergency power generators. The major facilities will be installed on the 7th floor to prevent the risk of flooding.

Power supply

Ecovoid: For natural ventilation in spring and autumn and in the event of a disaster

During spring and autumn when the weather is mild, and when the air conditioning system has stopped in a disaster, the natural ventilation openings on the exterior wall will take in fresh air, which カジノシークレット 出金 確認 discharged from the Ecovoid. This natural ventilation system keeps the offices ventilated to the extent necessary. It will also contribute greatly to infection control.

Ecovoid
Simulation of ventilation with Ecovoid

Backup power supply in the event of a disaster
(with operations of the emergency power generator and the co-generation system)

Backup power supply in the event of a disaster

Warehouses for disaster stockpiling
and facilities for people with
difficulty returning home

Warehouses for disaster stockpiling will be allocated in common areas on office floors and various parts of basement floors. In addition to the square which has a seismic-isolated structure, カジノシークレット 出金 確認ilding will have a temporary accommodation facility for people with difficulty returning home due to a disaster. With these and other facilities, カジノシークレット 出金 確認ilding will have an advanced district continuity plan(DCP).

Warehouses for disaster stockpiling and facilities for people with difficulty returning home