Overview of the building and equipment
Name | カジノ シークレット 勝てるDING(Tentative Name) |
Location | 1-7 Kyobashi, Chuo-ku, Tokyo(Lot number) 1-7-1 Kyobashi, Chuo-ku, Tokyo(Residence indication) |
Access | Approx. a 7-minute walk from Tokyo Station on JR lines, approx. a 3-minute walk from Kyobashi Station on Tokyo Metro Ginza Line, approx. a 5-minute walk from Nihombashi Station on Tokyo Metro Ginza Line and Tozai Line, approx. a 5-minute walk from Nihombashi Station on Toei Asakusa Line, カジノ シークレット 勝てるpprox. a 7-minute walk from Takaracho Station on Toei Asakusa Line Approx. 400 m from Takaracho exit on the Shuto Expressway |
Use | Offices, commercial facilities, cultural facilities |
Site area | 6,147 ㎡ |
Building area | Approx. 4,679 ㎡ |
Total floor area | Approx. 94,813 ㎡ |
Total rentable area(offices) | Approx. 34,527 ㎡ |
Structure | Part aboveground: Earthquake-resistant core-wall structure(reinforced concrete structure, steel-frame structure) Part underground: Reinforced concrete structure, steel-frame reinforced concrete structure |
Size | 3 basement floors, 28 above-ground floors, 1 penthouse floor |
Parking | Mechanical parking facility on the 2nd basement floor: 66 vehicles Drive-in parking facility on the 2nd basement floor: 22 vehicles(including seven with EV charger) Cargo-handling parking on the 1st basement floor: 10 vehicles Parking for wheelchair users on the 2nd basement floor: 3 vehicles |
Porch | Porch on the 2nd basement floor |
Security and management | 24-hour manned management in the disaster control center on the 1st floor, access control with non-contact IC card reader, ITV monitoring camera system |
Disaster control | A variety of fire-prevention equipment designated by law, including sprinklers, indoor fire hydrant systems, connected water supplying pipe equipment, nitrogen gas fire extinguisher, and foam extinguisher systems |
Power supply | Special high-voltage 22 KV, three-line spot network power receiving system |
Emergency power supply | 3,000 kVA emergency power generator to be installed on the 7th floor, ready to operate for approx. 72 hours running |
Amenities | Pantry on each floor, roof garden for tenants on the 28th floor, exclusive cafeteria, rental meeting rooms, lounge, カジノ シークレット 勝てるnvenience store for tenants on the 13th floor |
Barrier-free facilities | Elevators, toilets, and disabled parking |
Environmental features | Roof greening, greening of above-ground parts, reuse of non-fecal wastewater and rainwater through greywater treatment, natural ventilation, solar power generation system, and use of power from renewable energy sources |
Project implementing body | Toda Corporation |
Design and supervision | Toda Corporation First-Class Architect Office |
Construction | Toda Corporation |
Completion | September 2024(planned) |
Overview of office floor equipment
Rentable area of a standard floor | Approx. 2,384 ㎡ |
Areas of partitioned spaces | Approx. 654 ㎡, approx. 256 ㎡, カジノ シークレット 勝てるpprox. 239 ㎡(6 partitions) |
Minimum area of partitioned space | Approx. 239 ㎡ |
Ceiling height of a standard floor | 2,900 mm(Special floor: 3,200 mm) |
Basic module | 3,600 mm x 3,600 mm |
Ceiling | Grid system ceiling |
Illumination | LED lights, automatic dimmer control with daylight sensor |
Air conditioning | 24-hour central air conditioning system, temperature control(VAV system)with approx. 50 m2 per zone(56 zones per floor) |
Additional air conditioning equipment | Space for outdoor units of tenants’ air-conditioning equipment to be spared on the balcony |
Floor load | 500 kg/㎡(Heavy duty zone: 1,000 kg/㎡) |
OA floor | H = 100 mm(Special floor: H = 300 mm) |
Power supply to floors | Power distribution board installed in EPS on each floor |
Electric capacity | Capacity of office automation floor electrical outlet: 50 VA/㎡(Addition of 15 VA/㎡ possible) |
Emergency power supply | The building’s emergency power generator カジノ シークレット 勝てる-generation system will supply power to the overall building(Tenants’ exclusive areas: 15 VA/㎡ for 72 hours) |
Communication lines | Telephone: 80 lines(station lines)per floor as the standard, optical fiber cables Equipment for lead-in cables: Pipes to terminal board on each floor and cable racks |