BUILDING PLAN
Cultural facilities on the lower floors and offices on the 20 upper floors
OFFICE
The office feels conducive to something creative and exciting happening there.
カジノ シークレット 無料ntrance has a calm, elegant atmosphere, in contrast to the bustle of the main street.
The sophisticated space will make people feel mentally prepared for work. In addition, fulfilling communal areas, including the cafeteria and lounge,
which will support business life, and wide open office spaces will help people perform at their best.
The safe, reliable seismic-isolated RC core-wall structure will protect corporate assets, while the highly flexible floor plans will support corporate activities.
APPROACH
OFFICE FLOOR
The standard floor area will be approx. 2,384 ㎡.
It will be an open, column-free space that will cater to diverse business needs with leading-edge office specifications.
Ceiling height of a standard floor |
2,900 mm(*Special floor: 3,200 mm) | |
Ventilation | Introduce a natural ventilation system | |
Illumination | LED illumination (Automatic dimmer control with a daylight sensor) |
|
Floor load | 500 kg/㎡(Heavy duty zone: 1,000 kg/㎡) | |
OA floor | Height= 100 mm(*Special floor: 300 mm) | |
Capacity of electrical outlets |
50 VA/㎡(Addition of 15 VA/㎡ possible) | |
Earthquake |
Seismic-isolated RC core-wall structure |
|
Inner stairs | Installation possible | |
*Special floors[13th, 23rd, and 27th floors] |
Detailed air-conditioning zoning,
with each zone being approx. 50㎡
In rooms for rent, air conditioners will be allocated based on partition lines, which will divide a floor into six partitions. Detailed air conditioning zoning will be enabled by a variable air volume(VAV)system, which will permit switching between On and Off, temperature control, and air volume control for each one of 56 zones, each being approx. 50㎡. A latent/sensible heat separating air conditioning system will be adopted to provide comfortable office spaces with appropriately controlled temperature and humidity.
A security system and prevention of elevator congestion
A safe, reliable non-contact IC card key and a destination-based elevator control system will be adopted. The destination-based elevator control system will prompt passengers to board specific elevator cars based on their destination floors, so as to improve カジノ シークレット 無料fficiency of transportation and prevent congestion in the morning.
LAYOUT
PLAN1 Activity-based working(ABW)floor plans for diverse workstyles
152 seats with 15.7 ㎡/person
Number of seats Regular seats | 149 seats |
Executive room | 3 rooms |
Meeting area | 40 areas |
Meeting rooms/ Reception rooms |
カジノ シークレット 無料 26 people カジノ シークレット 無料 24 people カジノ シークレット 無料 21 people カジノ シークレット 無料 10 people カジノ シークレット 無料s for 8 people 7 rooms for 6 people |
PLAN2 An island-type floor plan featuring high space efficiency
252 seats with 9.5 ㎡/person
Number of seats Regular seats | 249 seats |
Executive room | 3 rooms |
Meeting area | 40 areas |
Meeting rooms/ Reception rooms |
カジノ シークレット 無料 24 people カジノ シークレット 無料 18 people 3 rooms for 10 to 12 people 2 rooms for 8 to 9 people 9 rooms for 4 to 6 people |